5 m) sprawdza się przy małych instalacjach z jednym punktem poboru
Capacity: 650
Industrial plants and drainage installations – increased resistance to sand
5 generates lower operating costs and reduces the risk of failure resulting from the need to synchronize two devices
Szafa sterownicza SPS 2x7,5kW/400V+4P (CR3.1+LCP+GN230+cokół) Pompa do ścieków 5 m) sprawdza się przyFunctions implemented: Power supply two 3~400V pumps with a power of 7. 5kW, main switch, Residual current circuit breaker, Motor overload protection, Star Delta Start up, Operator panel with controls and switches, Auto 0 Rka: Automatic operation, turning pumps off or on manually, Alternate operation of two pumps, In the event of a failure of a working pump, the next one takes over its operation automatically, When operating for more than 20 minutes,